NATURGY, Combined Cycle Power Station, Arrúbal, La Rioja
GAS NATURAL - SIEMENS, 800MW
0
Shares
Share
0
0
Arrúbal, La Rioja
Diciembre 2.003 – Diciembre 2.004
Total working surface: 104,000 m
2
Total erected surface: 45,000 m
2
Concrete volume: 10,800 m
3
Formwork surface: 18,000 m
2
Corrugated Steel: 210,000 kg
Precast concrete parts: 450 ud
Centering: 59,500 m
3
TECHNICAL DATASHEET
HOME PAGE
MAIN AREAS
PETROCHEMICAL
TANK PARKS
HIDROELECTRIC
ELECTRIC
LOGISTICS
AUTOMOTIVE
INDUSTRY
BUILDING WORKS
MAINTENANCE SERVICES
ABOUT US
SUSTAINABILITY
VALUES
MANAGEMENT SYSTEMS
ETHICS AND TRANSPARENCY
OUR WORKS
LATESTS NEWS
JOB CAREER
WHERE WE ARE
WORK PLACE