• +34 977 21 53 04
  • weare@carbonellfigueras.com
CARBONELL FIGUERAS, S.A.CARBONELL FIGUERAS, S.A.
  • HOME PAGE
  • MAIN AREAS
    • PETROCHEMICAL
    • TANK PARKS
    • HIDROELECTRIC
    • ELECTRIC
    • LOGISTICS
    • AUTOMOTIVE
    • INDUSTRY
    • BUILDING WORKS
    • MAINTENANCE SERVICES
  • ABOUT US
  • SUSTAINABILITY
    • VALUES
    • MANAGEMENT SYSTEMS
    • ETHICS AND TRANSPARENCY
  • OUR WORKS
  • LATESTS NEWS
  • JOB CAREER
  • WHERE WE ARE
  • WORK PLACE
  • No menu assigned!

NATURGY – SIEMENS, Central de Ciclo Combinado, 1.200MW, Huelva

Palos de la frontera
  • 0 Shares Share
    0
  • 0
  • Palos de la frontera, Huelva
  • May 2.003 – November 2.004
  • Surface of the lot: 50,000 m2
  • Total constructed surface: 10,000 m2
  • Volume excavation of land: 15,000 m3
  • Concrete volume: 20,000 m3
  • Kg. Structure: 3,000,000 Kg
  • Kg. Armed: 2,000,000 Kg
PROJECT FICHE
Carbonell Figueras

C/Mallorca, 22
43005 Tarragona, SPAIN

T. +34 977 21 53 04

weare@carbonellfigueras.com

All rights reserved ©2019

Main areas

  • Petrochemical
  • Tank Parks
  • Hidroelectric
  • Electric
  • Logistics
  • Automotive
  • Industry
  • Architecture
  • Maintenance Services

About Carbonell Figueras

  • About us
  • Our Values
  • Legal Notice and Privacy Policy
  • Job Career
  • Where We Are
  • HOME PAGE
  • MAIN AREAS
    • PETROCHEMICAL
    • TANK PARKS
    • HIDROELECTRIC
    • ELECTRIC
    • LOGISTICS
    • AUTOMOTIVE
    • INDUSTRY
    • BUILDING WORKS
    • MAINTENANCE SERVICES
  • ABOUT US
  • SUSTAINABILITY
    • VALUES
    • MANAGEMENT SYSTEMS
    • ETHICS AND TRANSPARENCY
  • OUR WORKS
  • LATESTS NEWS
  • JOB CAREER
  • WHERE WE ARE
  • WORK PLACE
  • Català
  • Español
  • English